Return to Top

2023 Design Review Fees

   Suncadia

Nelson Preserve

Tumble Creek

Design Review Fee

5,000.00

5,000.00

5,000.00

Construction Monitoring Fee

700.00

700.00

700.00

Construction Monitoring hourly rate

30.00

30.00

30.00

Additional Site Visits ( 2 included)

100.00

100.00

100.00

*Alterations or additions of an existing structure

TBD

TBD

TBD

Designer Approval

150.00

150.00

150.00

*Driveway Revisions

50.00

50.00

50.00

Excessive Review Time

100-150 hr.

100-150 hr.

100-150 hr.

*Fireplace Addition/Deletion

100.00

100.00

100.00

*Lighting Fixture Changes*

50.00

50.00

50.00

*Major Exterior Changes

500.00

500.00

500.00

*Major Remodel

1,500.00

1,500.00

1,500.00

*Major Site and or Landscape Improvements

700.00

700.00

700.00

*Minor Exterior Changes

250.00

250.00

250.00

*Minor Site and or Landscaping Improvements

250.00

250.00

250.00

Request for Plan Copies

Cost + 10%

Cost + 10%

Cost +10%

*Resubmission of Plans

1,000.00

1,000.00

1,000.00

*Review of Detached Ancillary Structures

500.00

500.00

500.00

Special Meeting

100 per hr.

100 per hr.

100 per hr.

*Terraces, Balconies, Decks, Porches, Railings

250.00

250.00

250.00

Tree Removal and Thinning Requests

250.00

250.00

250.00

*Walls, Fences and Gate Reviews

250.00

250.00

250.00

*Water Features, Pools and Spas

250.00

250.00

250.00

*Window and Door Changes

100.00

100.00

100.00

* Denotes fees that apply only after final approval has been granted by the DRC.  Items not listed will be charged at a rate appropriate for the service provided.

A complete description of services is available by contacting the DRC office at 509-649-6272.

The Design Review fee is due at the time the Preliminary Design package is submitted. Please make the check payable to SROA.

The Damage and Compliance Deposit is due at the Pre Construction meeting.  This must be received by our office before any site disturbance. The deposit will be returned after the final inspection has been completed and approved. Please make the check payable to SROA.

The Construction/Compliance Monitoring fee is due at the Pre Construction Meeting.  Please make the check payable to SROA.

The Solid Waste Fee is due at the Pre Construction meeting.  Your contractor calculates the fee based on the square footage of the home including covered decks and garages. This check must be received by our office before any site disturbance. Please make the check payable to Suncadia Community Council.

The Construction Sign fee is due prior to construction activity.  Please make the check payable to Suncadia Community Council.

The address marker is required to be ordered at the Pre Construction meeting. Please make a check payable to Suncadia Community Council.